Monday, February 11, 2013

900 kw project, John Muir Medical Center, Concord, CA



These are Co-generation machines, combined heat and power systems. They create power, supply hot water, A/C, Diesel Engines with natural gas and inductive generators while using waste recovery processes. Very efficient but high maintenance and costly up front costs.

Link to company I worked for that installed this:

http://www.eliteenergysys.com/



Posted by Josh Kinzer

1 comment: